Instrument Selection & System Design
-
How do I select the right instrument for the measurement I need?
Start with the measurement objective, required range, accuracy, site conditions, installation method and monitoring frequency. GEL can then help identify suitable instrumentation and system components. -
What information does GEL need to recommend suitable instrumentation?
GEL needs to understand what you are measuring, expected measurement range, site conditions, installation constraints, monitoring frequency, required automation and how data will be collected. -
How do measurement range, accuracy and resolution affect instrument selection?
The measurement range should cover expected conditions without compromising useful resolution. Accuracy requirements depend on the monitoring objective, project conditions and decisions the measurements need to support. -
How do ground conditions and installation constraints affect instrument selection?
Ground conditions influence installation methods, instrument protection, access and long-term performance. GEL considers these factors alongside the measurement requirement when configuring instrumentation for the monitoring system. -
How do I decide between manual and automated monitoring?
The choice depends on monitoring frequency, project risk, construction stage, site access, response requirements, communications and available power. GEL can configure manual, automated or hybrid approaches. -
How should monitoring frequency be determined for different project stages?
Monitoring frequency should reflect project risk, construction activity, expected changes and required response time. Higher-frequency acquisition may be appropriate during active works or changing site conditions.
Instrumentation & Installation
-
What should I consider when specifying a vibrating wire piezometer?
Consider the required pressure range, installation method, expected groundwater conditions, measurement location, monitoring frequency, cable routing and whether readings will be collected manually or automatically. -
What is the difference between an inclinometer and an in-place inclinometer?
An inclinometer typically provides periodic measurements of subsurface lateral movement, while an in-place inclinometer can support more frequent or automated monitoring where continuous movement information is required. -
How does instrument installation affect the reliability of monitoring data?
Installation affects how accurately an instrument represents the condition being measured. Orientation, placement, coupling, cabling, protection and commissioning all need to suit the monitoring objective. -
What needs to be considered when installing instrumentation for long-term monitoring?
Long-term installations require consideration of instrument protection, cable routing, environmental exposure, access, baseline readings, maintenance and future data acquisition requirements throughout the monitoring program. -
What should be included in an instrumentation installation record?
Records should capture installed instrument details, location, installation information, cabling, configuration and baseline readings. These records provide useful reference information for commissioning, monitoring and future troubleshooting. -
What baseline measurements should be established after instrumentation is installed?
Baseline readings should establish the instrument's initial condition before monitoring data is interpreted over time. GEL can establish baseline records during commissioning as part of the installation process.
Data Acquisition & Integration
-
How do I select the right data logger for my instrumentation system?
Logger selection depends on instrument outputs, channel requirements, sampling intervals, communications, power availability, site conditions and future expansion. GEL can configure acquisition around the selected instrumentation. -
How many channels does my monitoring system need?
Channel requirements depend on the number and type of instruments, required measurement parameters, interfaces and acquisition configuration. Additional capacity may also be considered for future monitoring expansion. -
How should sampling intervals be selected for automated monitoring?
Sampling intervals should reflect how quickly the monitored condition can change and how quickly information is required. Project risk, construction activity and system capacity also influence the configuration. -
Can GEL integrate instruments from different manufacturers into one monitoring system?
Yes, where components are compatible. GEL can review existing instrumentation, data acquisition and communications equipment and configure a practical monitoring workflow without automatically requiring single-brand replacement. -
What needs to be considered when setting up telemetry at a remote monitoring site?
Remote telemetry requires consideration of network availability, communications hardware, power, data transmission requirements, site conditions and monitoring frequency. GEL can configure these elements as part of the wider system -
How should power be designed for an automated monitoring system?
Power requirements depend on instrumentation, data loggers, communications equipment, sampling frequency and site conditions. Available mains, battery or solar options should be assessed as part of system design.
Convue & Monitoring Data
-
What is Convue and where does it sit within the monitoring system?
Convue is GEL's monitoring software and data platform. It sits after field instrumentation, data acquisition and communications, bringing monitoring information together for visualisation, alerts and reporting. -
What data can be brought into Convue from a monitoring network?
Convue brings monitoring measurements into one environment, allowing project teams to review information such as readings, locations, trends and alerts within the monitoring system. -
How does Convue fit into the system between field instrumentation and project reporting?
Field instruments generate measurements, data acquisition collects them and communications transfer the information. Convue brings the resulting data together for monitoring review, visualisation, alerts and reporting. -
Can an existing monitoring system be connected to Convue?
Potentially, depending on the existing instrumentation, data acquisition equipment, communications and available interfaces. GEL can review the existing system and assess the requirements for connecting it to Convue.
Troubleshooting & Existing Systems
-
What should I check when an instrument or monitoring channel stops reporting?
Check the instrument, cabling, power, logger configuration, communications and data flow before assuming the sensor has failed. GEL troubleshooting considers the complete monitoring chain. -
How can I determine whether a monitoring fault is caused by the sensor, logger, communications or power system?
Fault diagnosis should work through the monitoring chain systematically, checking readings, connections, power, configuration, communications and data flow. GEL can help identify where the failure is occurring. -
Can existing instrumentation be retained when upgrading an older monitoring system?
Often, suitable existing instruments can be retained while outdated data acquisition, communications or software are upgraded. GEL first reviews the installed system and component condition before recommending changes.