The challenge

Underground mines need to know whether the rock above working roadways is moving, including above the roof bolts where movement can't be seen. The mine needed reliable instruments on site quickly.

Our solution

  • Built multi-point roof extensometers at GEL's Brisbane workshop

  • Each instrument measures roof movement at five different heights

  • Delivered directly to site on a short lead time, with no overseas shipping

  • Backed by local calibration, repair and support

The result

  • The mine's geotechnical team can see where in the roof any movement starts

  • Instruments on site when needed, without international lead times

  • Australian support for the life of the instruments

Key Project Details

Client Name

Queensland Underground Coal Mine

Location

Central Queensland

Service

Instrument manufacture and supply

Years Active

2026

Project Images