The challenge
The active open cut had to be instrumented around live mining and scheduled blast windows. Access was restricted and installation windows were short, while repeated blast vibration placed demands on sensor and cable reliability. The site geotechnical team needed dependable pore pressure readings to assess slope stability during critical excavation stages.
Our solution
Planned installation sequencing with the site geotechnical team to fit production and blast schedules.
Supplied and installed 12 GEOKON 4500S vibrating wire piezometers, each with a 350 kPa range, with cable routes and junction boxes positioned to reduce exposure to plant movement and blasting.
Supplied 2 GK-403 readout units and 4 GK-700 cable junction boxes.
Commissioned and verified the instruments, established a baseline, and handed over the readout equipment and junction boxes so the site team could collect readings on its schedule.
The result
The instruments performed within specification, with no sensor failures reported during the instrumented period, including through blast events.
Scheduled readings were delivered without gaps in the monitoring record.
Monitoring continued while production proceeded, giving the geotechnical team measured pore pressure data to inform slope stability decisions.